黄色片网站入口,亚洲欧美va,在线看不卡的av,污污黄黄在线,在线观看一区二区视频,91精品美女在线,在线观看亚洲区

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.